The brief
A development car needs a baseline. Diagnostics, fluids, tyres, alignment, ambient conditions and test procedures must be recorded before modification begins.
Objective
Create repeatable standard-condition data for every later comparison.
Work completed
Test matrix drafted. Actual vehicle results are not yet available and are not fabricated for this staging build.
What fought back
Separating a real improvement from weather, tyres, driver variation and inconsistent test conditions.
Measurements
- Dyno
- Pending
- Lap time
- Pending
- Quarter mile
- Pending
- Corner weight
- Pending
Outcome
Method prepared; measurements pending.
NEXT ACTION
Run diagnostics and inspection, then schedule the first controlled test day.
